High Capacity Incinerators

Manufacturing Innovative Waste Incineration Facilities

Providing strong and reliable waste incineration solutions from 500kg to 2000kg an hour destruction of all solid waste streams. At the forefront of the design and manufacture of lasting incineration solutions for multiple waste streams for many years. Techtrol produces a range of low and high capacity solid waste incinerators for use across the Agricultural, Medical and General waste industries. Having our network of highly experienced engineers in the design and production of many of the worlds most efficient incineration machines.

Made by hand in the heart of England and installed across the world Techtrol are renowned for their quality, reliability and features for expertly managing all your waste requirements. Specialising in the development and manufacturing of High Capacity, Waste to Energy and bespoke installations most commonly treating Clinical, Medical and Hazardous waste in dedicated facilities.

C1000 High Capacity Incinerator
Man in hi vis jacket walking by a high capacity incinerator

Launching in 1985 our incinerators have been proven to provide a highly economical solution whilst adhering to the strictest environmental standards currently expected from our customers. Working closely with our customers to give you the best solution for your waste.

At the forefront of the industry in designing machines to suit your needs using the latest in computer aided design and computational fluid dynamics to deliver superbly efficient solutions that have been satisfying our customers for decades. We are dedicated to continuing excellence in manufacturing waste incineration systems through our commitment to innovation.

When you are searching for a reliable and efficient solution join the growing network of satisfied customers and choose a Techtrol installation.

The Techtrol Range

Operating within three core industries, the Techtrol name quickly became recognised for providing high-quality incinerators along Animal, Clinical and General waste requirements. Whilst developing clean solutions to waste management we have also developed a number of industry leading Waste To Energy facilities.

Animal

Having a focus on helping you maintain Biosecurity the Animal range of machines enable companies to manage livestock waste onsite.

Clinical

Specialising in securely incinerating hazardous clinical waste our Clinical range are built for disposing of Hospital and clinical waste.

General

Built to incinerate most other forms of General municipal waste from compact solutions to high capacity waste management facilities.

Waste to Energy and High Capacity expertise.

For over 30 years Techtrol have been developing a range of highly efficient and environmentally sustainable machines for waste disposal. Creating complete turnkey installations for some of the worlds most innovative organisations enabling them to dispose of their waste in the most efficient and economical processes currently available.

Addressing the future of incineration today, through designing and manufacturing a growing range of the most hard working and reliable machines that are available today. Managing the complete process at every stage from initial concept, planning and permitting. Design, and manufacture through to Installation, Commissioning, Training and ongoing Support.

DCIM/100MEDIA/DJI_0462.JPG

Testimonials

  • No hesitation in recommending the services of Techtrol

    Since the middle part of the year 1998, when L & P Furnaces were taken over by C.T.I. and the L & P staff (Kevin Evans, Malcolm Baines and some others) joined Techtrol, I have used this company exclusively to maintain the L & P cremators at Durham Crematorium.

    The continuing level of service received from Techtrol has been excellent and, in the event of an emergency (mercifully on very few occasions), the response has been very quick.

    The cremators have been serviced regularly and problems have been minimal. The cremators were recently tested independently for the E.P.A. (1990) and passed without problems.

    I would have no hesitation in recommending the services of Techtrol, in the light of my own experience with this company.

    A S José,
    Superintendent and Registrar
    Central Durham Crematorium
  • Very professional and flexible to work with

    Techtrol Limited tendered for and won a contract for the installation of a Clinical Waste Incineration Plant, complete with Waste Heat Boiler, to replace our existing facility at the Campus.

    During the installation, all work was carried out to a high standard and was efficiently completed. During this period I found the Techtrol management and their engineers to be very professional and flexible to work with.

    Since completion the plant has performed admirably in the terms of throughput, reliability and emissions to the atmosphere, the latter always being well within the permitted limits. Further to this the aftersales service, offered by Techtrol, is excellent and I have no reservations in recommending this Company for any future installation.

    Any prospective purchaser who wishes to view our installation is welcome to visit the Campus, by arrangement with Techtrol Limited.

    Brian A Stafford
    Surveyor's Office
    Faculty of Agricultural Food Sciences, The University of Nottingham
  • Masters in the profession of incineration

    Techtrol Limited installed a Pyrocol 450 incinerator in Quintiles England some six years ago. Since that date, it has produced more than satisfactory results, as demonstrated below.

    I have never had a complaint from the Environmental Authorities or other agencies involved in waste and pollution inspections.

    The staff at Techtrol are courteous and prompt when dealing with queries, and extremely professional when the plant undergoes annual servicing.

    I am able and pleased to thoroughly recommend Techtrol as masters in the profession of incineration and aftercare

    C M West
    Waste Disposal Officer
    Quintiles Preclinical Services, Quintiles England Ltd
  • The service has been excellent

    Rose Hill Crematorium have four L & P Cremators, these were installed by Kevin and Malcolm who at that time worked for the above company. When L & P were taken over by Cremation Technology International the customer service care and maintenance programme was not acceptable.

    Techtrol approached Rose Hill regarding our maintenance work, I received information regarding price and service and up to the present day feel we have had value for money.

    Techtrol have been maintaining our Cremators for the past two years. The service has been excellent, any problems that we encounter are dealt with almost immediately. Techtrol are extremely reliable and very flexible to meet our needs

    Mrs Amanda Carr
    Cemeteries & Crematorium Officer
    Doncaster Metropolitan Borough Council
  • I would recommend them to any Crematoria

    Following the acquisition of L and P Furnaces by C.T.I. in 1998, the Council decided to award any service contracts for the cremators to Techtrol Limited. This being due mainly to the engineers who had previously been employed by L and P Furnaces.

    Since then all services have been carried out to our satisfaction and fully detailed reports have been submitted for our reference.

    On the occasions when a problem has required an engineer, this has normally been within 24 hours and the problem solved during the visit.

    In 1999 a reline of the two cremators was carried out. Due to the design of our machines, this requires a closedown of the plant. Techtrol were awarded the work and it was carried out to schedule. Any additional problems were brought to our attention immediately and where appropriate the work was completed again on schedule.

    During the close down the chapel was in use for services and all Techtrol staff were sensitive and cooperative, causing no disturbance to services and the public.

    Overall I would have no hesitation in awarding further work to Techtrol Limited or recommending them to any other Crematoria

    C R Pollard
    Cemetery and Crematorium Manager
    Barrow-in-Furness Borough Council
  • Pleased to recommend

    On installation new in 1992, it was planned to subsequently retrofit to meet changing legislation on emission control.

    In 1995 Techtrol Ltd were chosen to design and carry out this major upgrade with a Project cost of £300K.

    I am pleased to report that the upgrade has been successful and ensures compliance with current and predicted legislation.

    Techtrol Ltd are also contracted to carry out routine planned maintenance and to provide specialist support.

    This, with operator training provided by Techtrol, is enabling high availability of the plant.

    I am therefore pleased to recommend Techtrol on this basis

    D J Wall (C Eng MIMarE)
    Chief Mechanical Engineer
    The University of Edinburgh
  • Competent and Reliable

    We can confirm that the above-named Company have held the Service Contract for our two Cremators for the last two years and we are at present arranging to extend this for a further year.

    We would not hesitate in recommending the services of Techtrol to others who are considering using them for the first time as they provide professionalism, technical competence, reliability and the flexibility to adapt to the requirements of their clients

    Ian Staplin
    Superintendent and Registrar
    Mountsett Crematorium
  • No hesitation in recommending Techtrol

    In 1993 Techtrol were successful in gaining a contract from the South Manchester Health Authority to design, install and commission a 400 Kg/hour Clinical Waste and heat recovery incineration plant at Wythenshawe Hospital.

    The plant was completed on schedule, without complication and has operated reliably to date.

    We would, therefore, have no hesitation in recommending Techtrol as a company committed to providing incineration equipment of the highest quality

    John Tucker
    Hospital Estate Manager
    Wythenshawe Hospital
  • To timescale and budget

    Following a competitive tender procedure, Techtrol Limited have recently completed the relining of an Evans Universal Series 300/2 cremator located at Stonefall Crematorium, Harrogate. The work was undertaken and completed within the given timescale and on budget. The standard of work was excellent and the level of disruption to the Crematorium was kept to an absolute minimum. Such was our satisfaction with Techtrol's staff and their standard of work, we have decided to use them for our second reline due to complete in September 1999. I have no hesitation in recommending Techtrol for this type of work

    A McCulloch
    Chief Engineer (Construction & Building Management)
    Harrogate Borough Council